Docs
Red-team findings
In short
The red team is a separate agent that tries to break your design. Findings have a severity; blockers stop the gate, majors need a fix or an accepted risk with a reason.
Severity
Severity
What it means
Blocker
Stops the gate until fixed or accepted by two people (Team plan)
Major
Fix it or accept it with a written reason
Minor
Advice; does not block
Note
For the record
What it looks at
Requirements: does the design solve the problem?
Engineering: failure modes, margins, wrong assumptions
Safety and law: harm, privacy, certified-installer steps
Sourcing and buildability: single source, end of life, tools needed
Accepting a risk
Write who accepts it and why. Accepted risks stay visible in the project and in the procurement guide, so a builder sees them too.
Previous
← Using the design agent
Next
Displays from Figma →
View as Markdown · Copy for AI